The 47-point walk is still to come.
- Checks
- Pending
- Internet
- Pending
- At 9pm
- Pending
- Walked
- Not yet
Bedroom 1 12 checks to do
Bedroom 2 12 checks to do
Bedroom 3 12 checks to do
Bathroom 1 10 checks to do
Living room 9 checks to do
Kitchen 9 checks to do
Bathroom 2 10 checks to do
Garden 4 checks to do
30 checks happen inside these rooms, 7 on the street, 10 across the whole house.
-
Safety and structural
-
Locks and security
-
Plumbing and water
-
Electrical and connectivity
-
Furniture and fittings
-
Environment
-
Trang’s neighborhood walk
What happens, in order
- Now A tenant lives here
The end of the current lease is not confirmed, so no walk date is set yet.
- Before move-in Trang walks the house
60 to 90 minutes inside with a clipboard, then an hour on the street. Every room measured and drawn.
- After the walk The record is signed and dated
Her name, the date, and the count of what passed and what did not, each named by number.
- Then This page fills in
The plan replaces the boxes, each room gets its readings, and the move-in date is set.
You’re on the list
One email when a home that fits has been walked. Nothing before then.